Egg Processing Facility, Toowoomba

Commissioned 2016

Location Toowoomba, QLD

icubed consulting were engaged by FKG to provide engineering advice on the development of an egg processing facility. We worked closely with FKG on various options to meet the requirements of the clients financial and growth requirements.

Processing 750,000 eggs per week required strict control over contamination and the majority of the hydraulic work involved the hot water systems with the application of multiple boilers. Being a large trade waste disposer, the facility looked at various reuse strategies through the use of tanks and contaminated and non-contaminated water supplies.

Civil engineering works involved the setting up of docks and staged areas for future building works whilst maintaining council standards for storm water quality and quantity.

Structural engineering included design detailing of interfaces between cold room panel, structural steel and concrete designed by us and others including internationally sourced supply items.

Disciplines
  • Civil Engineering
  • Hydraulic Engineering
  • Structural Engineering
Let's Talk About Your Project
Let's Talk About Your Project
Menu

Brisbane
+61 7 3870 8888

Melbourne
+61 3 8610 6362

Wynnum
+61 7 3396 7186

Toowoomba
+61 7 4632 3338

  • This field is for validation purposes and should be left unchanged.

 

icubed logo