Murra Warra Wind Farm
icubed consulting supported both Downer and Zenviron respectively in the 61-turbine Stage 1 Senvion Wind Farm and the 38-turbine Stage 2 General Electric Wind Farm. Situated in the flat Wimmera fields, the 220m blade tipped turbines can be seen rising above the morning fog. The flat, silty nature of the local environment posed an engineering […]
Murra Warra Wind Farm Read More »










