Murra Warra Wind Farm
Conceptually a 116-turbine wind farm, icubed consulting supported both Downer and Zenviron respectively in the 61-turbine Stage 1 Senvion Wind Farm and the 38-turbine Stage 2 General Electric Wind Farm. Situated in the flat Wimmera fields, the 220m blade tipped turbines can be seen rising above the fog for miles. The flat, silty nature of […]
Murra Warra Wind Farm Read More »