Construction Commences at “Proximity@Yatala”

Construction for Stage 2 of the Proximity@Yatala subdivision has commenced!
Completion of the subdivision works in this prime industrial real estate will see the creation of 8 new lots ranging from 5431m2 to 1.604ha.
As part of the works, the existing detention basin for the larger estate will be retrofitted to include a wetland, which will enhance the quality of the stormwater runoff from the development. By utilising the existing detention basin area for the stormwater quality treatment, icubed were able to increase the overall yield of the subdivision resulting in a real increase in value to the Client and future property owners.
icubed were able to provide an integrated approach to the design of the development due to their broad range of consultancy services provided in-house, creating efficiencies in both the overall cost and timeframe for the delivery of the project design, documentation and approval.
The consultancy services that were showcased in the delivery of documentation included:
  • Civil engineering design of sediment and erosion control, earthworks, roadworks and drainage, stormwater quality and quantity (wetlands), water reticulation and sewerage reticulation
  • Ecological reporting for Open Space Management Statements, Vegetation, Rehabilitation and Fauna Management, and
  • Landscaping design of the retrofitted wetland system.
With the onset of construction, icubed are excited to Project Manage this new subdivision!
To hear more about this subdivision and other icubed projects follow our blog at www.icubed.com.au or contact us on 07 3870 8888.
Menu
Contact Us

Brisbane
+61 7 3870 8888

Melbourne
+61 3 8610 6362

Wynnum
+61 7 3396 7186

Toowoomba
+61 7 4632 3338

  • This field is for validation purposes and should be left unchanged.

 

icubed logo