admin

Transporting Wind Turbines: An Oversized Challenge

The first wind turbine components have started arriving at the Bango Wind Farm project, which is located approximately 35km Northwest of Yass, NSW. The detailed design for over 37km of internal access tracks, 46 crane hardstands and Wind Turbine Generator (WTG) foundations are just some of the elements that encapsulate icubed’s involvement at Bango Wind …

Transporting Wind Turbines: An Oversized Challenge Read More »

Completion of Stage 2 of Hitachi Construction Machinery Australia Wacol Facility

The 2nd stage of Hitachi Construction Machinery Australia’s (HCMA) Wacol facility commenced in 2012 with the purchase of two allotments adjacent to their current Stage 1 development. Similar to their other sites, Wacol stage 2 was designed to accommodate a high-quality, serviced workshop, warehouse and office facilities. Other specialist fit outs included paint booths, wash …

Completion of Stage 2 of Hitachi Construction Machinery Australia Wacol Facility Read More »

icubed and Reality Modelling

Animated visualisation models are often a priceless tool for stakeholder presentation and comprehensive community consultations. At icubed we use a suite of software and cloud platforms to generate these models. Our process utilises the most accurate aerial and terrain data available often incorporating LiDAR, Photogrammetry and BIM modelling for greater visual effect. An icubed visualisation …

icubed and Reality Modelling Read More »

Amgrow Stapylton Bioretention Basins

icubed consulting were engaged by Amgrow to provide design and project management services for upgrades to stormwater quality devices at their existing facility at Stapylton. Construction of these devices are a part of Amgrow’s ongoing commitment to improving environmental management at the site. The project requirements saw the civil engineering department design two bioretention basins …

Amgrow Stapylton Bioretention Basins Read More »

Scroll to Top