Witmack Road Industry Park


Scope of Work


icubed consulting were engaged by FK Gardner and Sons to undertake the urban planning and detailed engineering design for this 80 hectare industrial subdivision near Toowoomba. The project, being delivered in 5 stages, has involved the design and documentation of significant external trunk infrastructure including a 300 diameter ductile iron water supply pipe and a significant sewerage pump station.

With approximately 1 million cubic metres of earthworks this is one of the most significant projects being undertaken in the Toowoomba region presently and has an end value of approximately 80 million dollars. icubed consulting have self-performed all of the elements associated with this project including water reticulation network analysis, sewerage reticulation network analysis, bulk earthworks management and stormwater quality control in accordance with state planning policy 04/10.


Dates: August 2009 – Ongoing


Disciplines: Civil Engineering, Landscape Design and Urban Planning


Sector: Land Development