Airport Link Kedron


Scope of Work


icubed consulting were engaged by Coffey Geotechnics to undertake the structural design and documentation of sheet pile walls, supporting walers and rock anchors at a particular location at Kedron Brook. Sheet pile walls at this location were associated with the initial rock cut where the excavation was taken into solid rock 60m below the existing ground prior to launching the tunnel boring machines.


Dates: March 2009 – August 2009


Disciplines: Structural Engineering


Sector: Government