Agnew School


Scope of Work


Total Construction Management engaged icubed consulting as their design partner in the delivery of a new private school campus in Wakerley. The School Trust desired completion of design, documentation, approvals and construction within a limited 8 month period, in readiness for the 2008 school year.

Although the final development consents were not in place, icubed consulting was able to work with the builder and the trustees to fast track the many demolition, operational works, and building approvals required for the project. We devised an optimised precast concrete composite slab construction system to enable major compression of the construction schedule and deliver the project on time.

The campus is capable of accommodating up to 300 students from Primary through to Secondary level and consists of a two level teaching and administration block and a multi-purpose centre for sports and functions.

The design response for this facility embraced key sustainable design practices.


Date: 2007


Disciplines: Architectural Building Design, Structural Engineering & External Civil Roadworks


Sector: Community